Let’s go!

Soil preparation begins. It is ploughed up to about 20 cm deep with a swallow plow that opens furrows 1 meter apart but does not turn over. The work of soil preparation and amendment addition was carried out with the collaboration of Engineering of the Natural Environment.

Let’s go! Read More ยป